Waterproofing is a critical element in the construction and maintenance of high-end buildings, particularly for five-star hotels that cater to both luxury and functionality. One such example is the Jiangsu Wangfu Bangrui International Hotel, a stunning 74,000 square meter establishment that adheres to the highest standards of design and comfort. As part of its ongoing commitment to quality, the hotel underwent a comprehensive waterproofing project, ensuring long-term durability and safety for its guests and facilities. In this article, we’ll explore the key aspects of this project, from the challenges faced to the advanced materials and techniques used, demonstrating how YURU Waterproofing played a vital role in delivering a top-tier solution for one of China’s premier hotels.
The Jiangsu Wangfu Bangrui International Hotel is a state-of-the-art five-star hotel located in the heart of Haian, Jiangsu Province. Designed to meet the highest standards set by the National Tourism Administration, this hotel serves as a comprehensive space for business, leisure, and events. With a total building area of 74,000 square meters, the hotel spans 26 floors, including 25 above-ground levels and 1 underground level. It boasts 20 banquet halls, 80 private dining rooms, and a wide variety of luxury guest rooms such as executive suites, deluxe suites, and business rooms, all aimed at providing an exceptional experience for its guests.
| Feature | Specification |
| Total Area | 74,000 square meters |
| Building Height | 99.6 meters |
| Floors | 26 floors (25 above ground, 1 below ground) |
| Banquet Halls | 20 |
| Private Dining Rooms | 80 |
| Guest Rooms | Executive Suites, Deluxe Suites, Business Rooms |
| Capacity | 8,000 guests for dining |
The waterproofing project faced several challenges due to the complex structure and high standards required by a five-star hotel. Key challenges included:
To tackle these challenges, YURU Waterproofing provided customized, high-quality materials and solutions that met the hotel’s specific needs while minimizing disruptions to its operations.
For the waterproofing project at the Jiangsu Wangfu Bangrui International Hotel, a combination of high-performance waterproof coatings and grouting materials was used to meet the rigorous demands of the five-star hotel. These materials were selected for their durability, flexibility, and ability to withstand extreme conditions such as high humidity, water exposure, and structural movement. Below is a detailed overview of the materials and technologies employed in this project.
The primary waterproofing material used in the project was a specialized high-quality polyurethane-based waterproof coating. Polyurethane coatings are known for their excellent adhesion, elasticity, and water resistance, making them ideal for both vertical and horizontal applications. This material was applied to various surfaces, including the exterior walls, roofs, and floors of the hotel.
| Feature | Specification |
| Elasticity | High flexibility, accommodates structural movement |
| Durability | Resists wear, UV exposure, and aging |
| Water Resistance | Provides long-lasting waterproof protection |
| Application | Suitable for both exterior and interior surfaces |
Superior Waterproofing: Polyurethane coatings provide a seamless, monolithic waterproof barrier, effectively preventing water ingress.
Long-Lasting Protection: These coatings have a long service life, reducing the need for frequent maintenance.
Quick Application: The coatings can be applied swiftly without significant downtime, ensuring minimal disruption to hotel operations.
For areas where traditional waterproofing coatings were not sufficient, particularly in underground facilities and areas subject to heavy water ingress, injection grouting was used. This method involves injecting a specially formulated polyurethane-based grout into the substrate to fill voids and cracks, creating an impermeable barrier. This technique is ideal for complex structures and spaces with hidden gaps or potential leak paths.
| Feature | Specification |
| Material Composition | Polyurethane-based, highly reactive |
| Flowability | High penetration ability, ideal for narrow cracks |
| Curing Time | Fast setting for quick results |
| Durability | Resistant to chemical exposure and moisture |
Effective Sealant for Cracks: Injection grouting is particularly effective for sealing cracks and joints in concrete, providing a comprehensive waterproof barrier.
Precision Application: The grout can be injected precisely where needed, reducing waste and ensuring targeted protection.
Flexibility: The grout can expand and contract with the structure, maintaining its integrity even under changing conditions.
YURU Waterproofing was able to offer customized solutions to the hotel’s specific needs by using a tailored combination of these materials. Our team provided comprehensive consulting services to identify the most suitable waterproofing technologies for different parts of the hotel. Whether it was the roof, basement, or bathrooms, YURU ensured that each area received the most appropriate, high-performance materials.
Additionally, YURU’s expert team handled the application process, ensuring that all materials were applied correctly and in accordance with the highest industry standards. Our focus on precision and customization allowed us to provide an effective, long-lasting waterproofing solution that met the hotel’s strict quality requirements.
In conclusion, the combination of polyurethane waterproof coatings and injection grouting materials, backed by YURU’s expertise, ensured that the Jiangsu Wangfu Bangrui International Hotel received top-tier waterproofing protection, safeguarding the hotel’s infrastructure for years to come.
The successful implementation of the waterproofing project at the Jiangsu Wangfu Bangrui International Hotel began with meticulous planning and preparation. In collaboration with the hotel management team, YURU Waterproofing conducted a thorough assessment of the building’s unique needs, taking into account factors such as structural design, water exposure, and potential risks.
Site Survey and Assessment
A detailed site survey was carried out to identify high-risk areas, including vulnerable spots on the roof, basement, and joints. This step helped pinpoint potential leak sources and allowed us to design a tailored waterproofing solution for each section of the hotel.
Material Selection and Customization
Based on the findings from the survey, YURU’s experts recommended the most suitable waterproofing materials, ensuring that each solution met the hotel’s specific needs in terms of durability, flexibility, and water resistance.
Approval and Coordination with Hotel Management
All materials, schedules, and work plans were reviewed and approved by the hotel’s management team, ensuring alignment with operational schedules. This phase also included coordination to ensure minimal disruption to the hotel’s day-to-day activities.
Once planning and approval were in place, YURU began the implementation phase, which involved both skilled labor and high-quality materials. The execution process was divided into several stages to optimize efficiency and minimize interference with the hotel’s operations.
| Phase | Description | Duration |
| Phase 1: Preparation | Set-up of equipment, scaffolding, and surface cleaning | 1 week |
| Phase 2: Waterproofing Coatings | Application of polyurethane coatings to selected surfaces | 2 weeks |
| Phase 3: Injection Grouting | Injection of polyurethane-based grout in cracks and joints | 1 week |
| Phase 4: Final Inspection and Curing | Quality inspection and final touches | 1 week |
One of the main challenges of this project was to ensure that the work did not interfere with the daily operations of the hotel, including events, guest stays, and catering services. To achieve this, the project was carefully scheduled to avoid peak hours, and construction work was conducted during off-peak times, such as late nights and early mornings.
Flexible Work Hours
By scheduling work during off-peak hours, the impact on hotel guests and operations was minimized. This ensured that the hotel could continue its business activities without significant interruptions.
Continuous Monitoring
Project progress was continuously monitored to identify potential delays early. This allowed for quick adjustments and ensured the project stayed on track.
Clear Communication with Hotel Management
Regular communication with the hotel’s management team ensured that the project was progressing as planned. Any issues that arose were addressed promptly, and necessary adjustments were made to the schedule to avoid delays.
The project was completed within the agreed-upon timeline, thanks to careful planning, effective time management, and strategic scheduling. The key was to balance quality with efficiency, ensuring that the waterproofing solutions were applied correctly while also respecting the hotel’s operational needs. By keeping the hotel management informed and involved throughout the process, YURU was able to ensure the project’s success without disrupting the hotel’s daily functions.
In summary, the careful planning, strategic scheduling, and continuous communication during the implementation of the waterproofing project at Jiangsu Wangfu Bangrui International Hotel were crucial in delivering a timely, high-quality solution while maintaining the smooth operation of the hotel.
Once the waterproofing project at the Jiangsu Wangfu Bangrui International Hotel was completed, a thorough evaluation was conducted to assess the overall effectiveness of the waterproofing solutions. This involved multiple inspections to ensure that all surfaces and areas covered by the waterproofing materials were fully protected against water infiltration.
The hotel underwent a series of post-installation tests, including water exposure tests, to simulate real-world conditions and verify the durability of the applied coatings and grouting. These tests ensured that the materials provided the intended level of water resistance and could withstand environmental stresses such as temperature changes, humidity, and mechanical wear.
| Test Type | Description | Result |
| Waterproofing Integrity Test | Simulating water exposure to verify resistance | Passed |
| Adhesion and Flexibility Test | Testing the bonding strength and flexibility of coatings | Passed |
| Leakage Test | Ensuring no leaks in critical areas (e.g., basement, roof) | No leaks detected |
These evaluations confirmed that the waterproofing system met all performance standards, with no signs of leakage or degradation in material integrity.
To ensure the continued effectiveness of the waterproofing system over time, it is crucial to establish a proactive maintenance plan. For the Jiangsu Wangfu Bangrui International Hotel, YURU Waterproofing recommended a comprehensive maintenance schedule that includes periodic inspections and touch-ups. This plan was designed to monitor the performance of the waterproofing system and address any minor issues before they become larger problems.
YURU Waterproofing also recommends that the hotel’s facilities management team conduct visual inspections every 6 months to monitor the condition of the waterproofing system. This helps in identifying any early signs of wear and prevents potential issues from escalating.
By offering a robust warranty and dedicated after-sales support, YURU Waterproofing ensures that the waterproofing system at Jiangsu Wangfu Bangrui International Hotel will provide long-lasting protection against water damage. Our commitment to quality and customer satisfaction ensures that the hotel will continue to enjoy a dry, safe, and comfortable environment for its guests for many years to come.
In conclusion, the waterproofing system at the Jiangsu Wangfu Bangrui International Hotel is designed to provide lasting protection. With ongoing evaluations, a clear maintenance plan, and our extensive warranty and after-sales service, YURU guarantees the performance and longevity of the hotel’s waterproofing system, ensuring peace of mind for hotel management and guests alike.
The success of the waterproofing project at the Jiangsu Wangfu Bangrui International Hotel can be attributed to a combination of key factors, all of which played a vital role in ensuring the perfect execution of the waterproofing system. From the selection of high-quality materials to the expertise of the construction team, each element contributed to the project’s overall success. Below are the critical factors that ensured the successful completion of the waterproofing project.
One of the most crucial factors in the success of any waterproofing project is the choice of materials. For the Jiangsu Wangfu Bangrui International Hotel, YURU Waterproofing carefully selected top-tier waterproofing coatings and injection grouting materials. The materials used were specifically chosen for their superior durability, water resistance, and flexibility, all of which are essential for a five-star hotel that needs long-lasting protection.
The use of high-performance materials guaranteed the longevity and reliability of the waterproofing system, ensuring the hotel’s infrastructure remained intact and protected.
Another critical factor in the project’s success was the expertise of the construction team. The YURU Waterproofing team has extensive experience in managing large-scale waterproofing projects, particularly for high-profile buildings like the Jiangsu Wangfu Bangrui International Hotel.
Skilled Workforce: The team consisted of highly trained professionals who were proficient in applying complex waterproofing systems, ensuring that every layer was applied precisely and effectively.
Project Management Expertise: Our project managers carefully coordinated every phase of the construction process, ensuring that deadlines were met and that the hotel’s daily operations were not disrupted.
Their experience with large, intricate projects like this one allowed for an efficient and smooth application of the waterproofing system, even in areas with challenging designs or high exposure to water.
A well-organized construction plan was essential for completing the project on time and within budget. From the early planning stages to the final inspections, careful consideration was given to every aspect of the project.
Customized Waterproofing Solutions: YURU Waterproofing worked closely with the hotel management to understand their specific needs and provided tailored solutions for different areas of the hotel. This ensured that the right materials and techniques were applied in each section, from the roof to the basement.
Scheduling and Coordination: To minimize disruptions to the hotel’s daily operations, work was carried out during off-peak hours, such as late nights and early mornings. This allowed hotel services to continue without major interruptions, ensuring guest comfort and satisfaction.
A clear and efficient construction plan not only ensured that the project was completed on time but also enabled the team to handle unforeseen challenges quickly and effectively.
Throughout the entire project, YURU Waterproofing emphasized a focus on quality control. From the selection of materials to the final inspection, every detail was carefully monitored to ensure that the waterproofing system met the highest standards.
Rigorous Testing: After the materials were applied, a series of rigorous tests were conducted to check the performance of the waterproofing system. This included water resistance tests and inspections for potential weak spots.
Ongoing Monitoring: Even after the completion of the project, the team conducted periodic inspections to ensure that the waterproofing system was functioning as expected, giving the hotel management peace of mind.
This attention to detail, paired with a commitment to quality, ensured that the waterproofing system would remain effective for years to come.
Effective communication between YURU Waterproofing and the hotel management team was a key element in the project’s success. Regular meetings and updates ensured that the hotel’s operational needs were always considered, and any concerns were addressed promptly.
Collaboration in Scheduling: The team worked closely with hotel management to create a schedule that minimized disruption to hotel operations.
Problem-Solving: Any challenges that arose during the construction process were swiftly communicated and resolved, maintaining smooth progress throughout the project.
This transparent communication helped ensure that all parties were aligned and that the project was completed with minimal impact on the hotel’s services.
The success of the waterproofing project at Jiangsu Wangfu Bangrui International Hotel can be attributed to several key factors, including the selection of high-quality materials, the expertise of the construction team, a well-organized construction plan, attention to detail, and effective collaboration with the hotel management. Together, these elements ensured that the hotel received a top-tier waterproofing system that will protect the building for years to come, while also maintaining the hotel’s operations without disruption. The comprehensive approach to planning, execution, and quality control was essential in delivering a perfect waterproofing solution for this prestigious project.
The feedback from the Jiangsu Wangfu Bangrui International Hotel management team has been overwhelmingly positive, particularly regarding the quality of the waterproofing system and the seamless construction process. As a five-star hotel, the management had high expectations for the durability, effectiveness, and aesthetic impact of the waterproofing solutions. YURU Waterproofing successfully met these expectations, and the hotel’s operations were not disrupted during the process, allowing them to continue delivering exceptional service to their guests.
The hotel management praised the high-quality materials used in the waterproofing project, particularly the polyurethane-based coatings and injection grouting. They noted that the materials provided excellent protection against water ingress, even in high-risk areas like the basement and roof. The coating’s durability and seamless application were particularly highlighted.
“The waterproofing system has been incredibly reliable, even during the rainy season. We’ve noticed a significant reduction in water-related maintenance issues, which has helped maintain our building’s integrity.” – Hotel Facilities Manager
The hotel team appreciated the efficient construction schedule that minimized disruption. The ability of YURU Waterproofing to complete the work during off-peak hours without interfering with hotel services was a key point of satisfaction.
“We were concerned about the potential impact on our guests and events. However, YURU’s team was flexible and managed to complete the work quickly, without disturbing our operations. Their planning and coordination were impeccable.” – Hotel Operations Director
Since the completion of the waterproofing project, the hotel management has noticed significant improvements in the overall performance of the building, especially in areas that were previously prone to water leakage. The waterproofing system has successfully protected critical areas such as the basement, roof, and bathroom floors from water ingress, even in challenging weather conditions.
The hotel has not experienced any major water leakage issues since the waterproofing was completed, and the building has remained dry and secure. The performance of the waterproofing system has exceeded expectations, offering peace of mind to the hotel management and preventing costly repairs.
“The waterproofing system has truly exceeded our expectations. We haven’t had any issues with leaks or moisture in the past year, even during heavy rainstorms. This has saved us both time and money on repairs.” – Hotel Maintenance Director
The overall satisfaction of the hotel management and operations team is high, with all parties agreeing that the project was a success. The hotel now enjoys a high level of protection, which not only preserves the building but also contributes to the smooth running of hotel services and guest satisfaction.
“We are very satisfied with the outcome of this project. Not only has the waterproofing system provided excellent protection, but it has also improved our building’s long-term sustainability. YURU’s professionalism and attention to detail were evident throughout the process.” – Hotel General Manager
The feedback from the Jiangsu Wangfu Bangrui International Hotel has been extremely positive, reflecting both the exceptional quality of the waterproofing materials and the efficiency of the construction process. The hotel management and operations team have expressed their satisfaction with the system’s performance, particularly the lack of water leakage and the minimal disruption to hotel services. YURU Waterproofing’s timely and professional execution has not only enhanced the hotel’s infrastructure but also improved the long-term maintenance and protection of the building. The success of this project serves as a testament to the effectiveness of YURU’s high-quality materials, experienced team, and customer-focused approach to waterproofing solutions.
The waterproofing project at the Jiangsu Wangfu Bangrui International Hotel stands as a prime example of how high-quality materials, expert execution, and thorough planning can come together to create a lasting solution for large-scale infrastructure projects. Throughout the project, YURU Waterproofing successfully met the challenges presented by the hotel’s complex structure and high operational demands.
From the careful selection of premium waterproofing materials to the meticulous management of the construction timeline, every step of the process was executed with precision. The result is a robust and reliable waterproofing system that not only protects the hotel from potential water damage but also contributes to the building’s long-term sustainability.
The positive feedback from the hotel’s management and operations team further attests to the success of this project. The waterproofing system has delivered on its promise, ensuring a dry, safe, and secure environment for both hotel guests and staff. Moreover, the seamless integration of the project into the hotel’s daily operations has highlighted the professionalism and commitment of YURU Waterproofing to client satisfaction.
As the hotel continues to operate without the disruptions caused by water damage, it’s clear that the waterproofing system will continue to provide value for many years to come. This project not only reinforces the importance of selecting the right materials and team but also emphasizes YURU Waterproofing’s capability to meet the demanding needs of prestigious clients like the Jiangsu Wangfu Bangrui International Hotel.
In conclusion, YURU Waterproofing is proud to have played a role in enhancing the quality and longevity of the Jiangsu Wangfu Bangrui International Hotel. The success of this project showcases our dedication to delivering exceptional waterproofing solutions tailored to the unique needs of each client.
Download our catalog to check all of our products, select the right waterproof products for your projects.